The dry season is rapidly approaching and with it comes more earthwork construction! The team of Geologists at Element is ready to help owners, developers, and contractors alike by providing geotechnical expertise for construction support in the upcoming season.

Surprises happen during site preparation and earthwork construction that can cause significant delays or add unexpected costs to a project. Element’s team has a strong background in construction phase consultation, and can help advise you on difficult issues where a qualified recommendation can have a big impact. We specialize in subgrade verification, T-probe and proof-roll observations, overexcavation and stabilization guidance, geotechnical pile observation and documentation, drainage troubleshooting, and much more. Keep us in mind when challenging soil conditions are anticipated or unexpectedly encountered on your site this construction season. 

Element can also offer timely auxiliary services that can arise during construction. We will help you confirm geotechnical soil parameters for suitability with design during the construction phase. We perform in-situ PIT-testing and visual inspections for drainage and stormwater facility construction verifications. Element staff can also provide geotechnical retaining wall construction oversight and documentation if required by your building permit. We can also provide temporary cutslope and slope stabilization consultation for problematic areas requiring creative solutions to ensure temporary excavation or long-term slope stability. Our team is ready to act quickly to help you keep your tight schedules and complete projects before the rain comes again. 

By Kevin Quillan 19 Jan, 2023
Experienced Wetland / Biologist / Environmental Scientist – Bellingham, WA
By Kevin Quillan 16 Nov, 2021
Flooding along the Nooksack River has caused significant damage throughout Whatcom County during a record-setting rain event during mid-November, 2021. As a cold front leaves us with clear skies, water continues to funnel from the mountains into our large rivers and flood several lowland communities. This event highlights the power of our river systems, and shows the importance of monitoring, mapping, and modeling our drainages so that we can predict and prepare for similar events in the future.
By Kevin Quillan 15 Apr, 2021
New Alluvial Fan Geohazard Review
By Kevin Quillan 25 Feb, 2021
The Shoreline Management Act (SMA) enacted by the Washington State legislature in 1971 requires most towns and cities to develop and implement Shoreline Master Programs (SMPs) to help preserve and protect Washington’s natural waters. The Ordinary High Water Mark (OHWM) must be determined on a site-by-site basis in order to properly implement the rules and guidelines found in the Shoreline Master Program.